• slidebg1

    TRANSFER STATIONS

    Waste, recycling and organics transfer stations serving Eastern Ontario.
    More Info >

  • slidebg1

    ORGANIC COMPOSTING

    State-of-the-art facility and services.
    More Info >

  • slidebg1

    COLLECTION SERVICES & WASTE AND CONTAINER RENTAL

    For all of your waste needs!
    More Info >

  • slidebg1

    WASTE DISPOSAL

    Safe disposal of solid non-hazardous waste.
    More Info >

About - Projects

Eastern Ontario Waste Handling Facility Landfill Expansion Environmental Assessment


GFL Environmental Inc. (formerly Lafleche Environmental Inc.), the owner and operator of the existing Eastern Ontario Waste Handling Facility (EOWHF) in Moose Creek, Ontario, has completed an Environmental Assessment (EA) in accordance with the requirements of the Environmental Assessment Act (EAA) seeking approval to expand the disposal capacity of the existing landfill at the EOWHF.  The proposed expansion will involve the development of Stage 3B and Stage 4 inside the boundaries of the existing EOWHF.  These landfill stages were identified for development in the original approval for the EOWHF.

 

The EOWHF is located within the Township of North Stormont, approximately 5 kilometres north-northwest of the village of Moose Creek, Ontario, and 5 kilometres east of the village of Casselman, Ontario.   The purpose of the EA is to assess the potential effects of the proposed landfill expansion on the environment. 

As required under Section 6.2(1) of the Environmental Assessment Act and according to the Terms of Reference approved by the Minister of the Environment and Climate Change on May 11, 2017, GFL has submitted its EA to the Ministry of the Environment and Climate Change (MOECC) for review and approval.

 

The EA

 


The GFL EOWHF Landfill Expansion EA Study Report will be available for public review and comment from June 1, 2018 until July 20, 2018.  

A copy of the EA Study Report and Supporting Documents can be reviewed by using the links provided below.  A hard copy of the EA Study Report may also be reviewed during normal business hours at the following locations.
 

Ministry of the Environment and Climate Change
Environmental Assessment and Permissions Branch
135 St. Clair Ave. W., 1st Floor
Toronto, Ontario  M4V 1P5
Ministry of the Environment and Climate Change
Kingston Regional Office
Unit 3, 1259 Gardiners Road
Kingston, Ontario  K7P 3J6
Ministry of the Environment and Climate Change
Ottawa District Office
2430 Don Reid Drive
Ottawa, Ontario  K1H 1E1
Ministry of the Environment and Climate Change
Cornwall Area Office
113 Amelia Street
Cornwall, Ontario  K6H 3P1
Township of North Stormont
Municipal Office
15 Union Street
Berwick, Ontario  K0C 1G0
GFL Environmental Inc.
EOWHF Administrative Office
17125 Lafleche Road
Moose Creek, Ontario  K0C 1W0


Anyone wishing to provide comments on the environmental assessment must submit their comments in writing by mail, email and/or fax to the Ministry of the Environment and Climate Change by July 20th, 2018.  All comments must be submitted to:

Adam Sanzo, Project Officer
Ministry of the Environment and Climate Change
Environmental Assessment and Permissions Branch
135 St. Clair Ave. W., 1st Floor
Toronto, Ontario M4V 1P5
Phone:              416-314-8360/1-800-461-6290
Fax:                  416-314-8452
E-mail:              adam.sanzo@ontario.ca

A copy of all comments will be forwarded to the proponent for its consideration. 

If you have any questions or need further information about this project, please contact:
 

Mr. Brian King, Director 
GFL Environmental Inc.
17125 Lafleche Road, Moose Creek, Ontario  K0C 1W0
Telephone: 613-538-2776 ext. 226
Fax: 613-538-2779
Email: bking@gflenv.com
 

 
Documents
 

Notice of Submission of Environmental Assessment  EA Study Report Review Avis de soumission du Rapport d’étude d’évaluation environnementale

EA Study Report


Executive Summary

Executive Summary (French)

Acronyms, Units and Glossary


Table of Contents

Section 1. Introduction

Section 2. Overview of the Environmental Assessment Process and Study Organization

Section 3. Overview of the Undertaking

Section 4. Description of the Environment Potentially Affected by the Undertaking

Section 5. Alternative Methods of Carrying Out the Undertaking

Section 6. Net Effects of the Alternative Methods

Section 7. Comparative Evaluation of Net Effects and Identification of the Preferred Alternative

Section 8. Net Effects Assessment of the Preferred Alternative

Section 9. Consultation and Engagement

Section 10. Monitoring and Commitments for the Undertaking

Section 11. Approvals

Section 12. References

Appendix A. Approved Terms of Reference (excluding supporting documents)

Appendix B. Terms of Reference Commitments Table


Supporting Document 1 – Existing Conditions Reports

SD 1-1 – Air Quality Existing Conditions Report

SD 1-2 – Odour Existing Conditions Report

SD 1-3 – Noise Existing Conditions Report

SD 1-4 – Geology and Hydrogeology Existing Conditions Report

SD 1-5 – Surface Water Part A: Water Quantity Existing Conditions Report

SD 1-6 – Surface Water Part B: Water Quality Existing Conditions Report

SD 1-7 – Natural Environment Existing Conditions Report

SD 1-8 – Socio-Economic Environment Existing Conditions Report

SD 1-9 – Cultural Heritage Existing Conditions Report

SD 1-10 – Transportation Existing Conditions Report

SD 1-11 – Land Use Existing Conditions Report

SD 1-12 – Landfill Design and Operations Existing Conditions Report



Supporting Document 2 – Conceptual Design Report

Supporting Document 3 – Net Effects Assessment Reports

 

SD 3-1 – Air Quality Effects Assessment Report

SD 3-2 – Odour Effects Assessment Report

SD 3-3 – Noise Effects Assessment Report

SD 3-4 – Geology and Hydrogeology Effects Assessment Report

SD 3-5 – Surface Water Quality Effects Assessment Report

SD 3-6 – Surface Water Quantity (On-Site Quality) Effects Assessment Report

SD 3-7 – Ecological Environment Effects Assessment Report

SD 3-8 – Socio-Economic Environment Effects Assessment Report

SD 3-9 – Cultural Environment Effects Assessment Report

SD 3-10 – Transportation Effects Assessment Report

SD 3-11 – Land Use Effects Assessment Report

SD 3-12 – Landfill Design and Operations Effects Assessment Report


Supporting Document 4 – Record of Consultation and Engagement

 

Notice of Commencement of EA (June 7, 2017)

A copy of the Notice of Commencement for the EA was published on June 7, 2017 and is available here:

GFL Notice of Commencment of EA and Public Open House ( June 7, 2017)



Terms of Reference

Terms of Reference Approval Letter (May 11, 2017)

Notice of Submission of Terms of Reference

Terms of Reference (July 2015)

Supporting Document #1 - Record of Consultation

Appendix A - Contact Lists - Aboriginal Communities and Organization, Government Review Team and Public

Appendix B - Notice of Commencement and Open House Materials 
(
Open House display boards not included due to size of the file.  Please see the link below – Public Open House #1 - February 25, 2015 for a complete copy)

Appendix C - Correspondence with Aboriginal Communities and Organizations

Appendix D - Correspondence Received

Appendix E - Municipal Correspondences

Appendix F - Draft Terms of Reference Review Correspondence